Replace Chillers at Bldg 750, Scott AFB, Illinois
PCS Project #: P-575-JV
Bid due date and time: March 26, 2010, Friday, 2:00 PM
Location: Scott AFB, Illinois 62225, MapProject Details:
1. The project involves designs build replacement of two existing chillers and equipment including all associated piping, controls, and electrical work. Install two new boilers. Temporary cooling and heating will be required
Please submit your proposal to us on the bid form provided below. IT IS VERY IMPORTANT that your quote be broken down as the bid form is due to the many options required for this project.
2. A CD Rom that has initial set of drawings and specs is available by request ONLY.
3. All RFI should be emailed or faxed over to us by 2:00PM on Friday, March 26, 2010.
4. Any updates or RFI answers will be posted on this website. Please visit this website from time to time to get an update on this project.If you have any questions, please email Michael Gerhardstein at michael.gerhardstein@pcschicago.com or call 773-290-1595.
Bid Form:
Drawings:
General Drawings:
Civil Drawings:
Landscape Drawings:
Architectural Drawings:
Interior Drawings:
Structural Drawings:
Mechanical Drawings: M-1, M-2, M-3, M-4, M-5, M-6
Plumbing Drawings:
Fire Protection Drawings:
Electrical Drawings: E-1
Specifications: Specification & Bid Form
Addendums:
RFIs: RFI responses as of 3/18/10; RFI Responses as of 3/23/10
Pictures: